RENEWABLES
At Finulent Solutions, we oversee all of the necessary documentation and paperwork for DNO submission (G98/G99/G100) and Local Planning Authority (LPA) requirements for solar systems, ensuring that your solar PV system is completely compliant with regulation, safety, and interconnection standards from day one.
Our team specializes in preparing correct technical drawings like SLD diagrams for solar installation, roof plans, site plans, and elevation drawings, tailored to meet compliance and project requirements.
Any installation connected to the grid, from a commercial roof to a multi-megawatt solar farm, has to be compliant with ENA Engineering Recommendations (G98, G99, G100).
We accurately prepare forms specific to inverter design, export capacity, and system size, eliminating common errors that significantly delay DNO approval timelines.
We coordinate the entire submission process via DNO portals, status tracking, communication, and dealing with additional requests, to enable clients to take advantage of the G99 fast-track application process where applicable.
For utility and large-scale projects, we maintain strict DNO compliance for solar farms, including technical requirements, interconnection, and safety requirements for grid acceptance.
In the UK, most solar projects need solar panel planning permission prior to installation. Whether commercial solar systems planning permission or domestic schemes in sensitive locations, Finulent makes sure your project is LPA compliant for solar installations.
We evaluate your site to determine whether it qualifies for permitted development solar panels or requires full Solar PV planning permission.
We draft all the drawings and impact assessments necessary under the LPA, such as:
Starting from the submission to the local council, up to query resolution and amendments, we handle each phase of the process to ensure project delay is kept to a minimum.
Expertise in solar documentation and approvals
Precision-based single line diagrams for error-free compliance
Proven experience with planning permission and solar projects
End-to-end handling of G99, G98, G100, and LPA submissions
Accelerated timelines with proven compliance and tracking methods